Pages

Sunday, March 27, 2011

Track Laying - Weekend 3/27 Udpdate

I have been working on finishing installing the ceiling tile sub-base for the rest of the Layout and some roadbed and track. I need to build a bridge and I am going to have to hand-lay a 45 degree crossing once my material gets here, so here are the latest photos.







I also need to started getting my Easy DCC system installed, so I can start working on track and turnout power/control wiring. I re-used the pull-out draw from the old HO layout and the booster panel.



No comments:

Post a Comment