Today was a short day (3-4 hrs) on the Layout, as I got to feeling bad after lunch. I did finish up the other side and clean up the room.
Then took the 1:1 plan I printed out awhile back and placed them on the layout for Staging and Clarksville
I need to pick up a couple items and start prepping the PECO turnouts for Tortoises and DCC. While working out the grade up from staging into Clarksville. It is presently a 3% Grade. A 3% should be ok, as I am going to limit trains to 10 cars, but I am going to look at trying to get this to 2%. I have also been looking at various ways to build the grade fom Woodland Scenic risers to building my own out of some 2" foam I have laying around.
No comments:
Post a Comment