Last three day I finish prepping the switch machine that my friend Rich C started for me.




Due to my thick deck I have to modify the throw arm of the switch machine. One modification is just using a longer .032 dia. wire. Second one is reinforcing the .032 dia. wire with some 1/16" dia. brass tubing. 




I use a small piece of double sided foam tape for temporary placement and the use a clamp above to prevent the wire from coming back out while I adjust the switch machine from below and finally anchor it with a couple of screws.


A few of the switch machine installed under the yard area.