All the track and switch machines are installed to either side of the bridge area. Here a couple of photos of layout as of today.
I also spend some time cleaning up the room this weekend. I have the new flooring and that needs to be installed, been considering doing that while working on the bridge and put some thought into the electrical/DCC power and control aspect of the layout.
No comments:
Post a Comment