Pages

Sunday, May 13, 2012

Progress - 13 May 2012

This week I got the yard ladder in and I had a visit by my MRR buddy Rich Saturday evening. The week started with locating and drilling the throw wire and frog wire holes for the turnouts. Determining the length and cutting of the small pieces of track between turnouts.


Then prep the nine turnout switches. I isolate the frogs by cutting gaps in the wing rails and soldering jumpers from the outside rail to the wing rails and add a wire to the frog for power. I also remove the Peco point spring. You can see more detail in earlier post.





Here the finish yard ladder installation started Thursday evening thru Sunday morning. More would have been accomplished but I ran out of magnets for my uncouplers and was only able to install the caboose/MOW track. Once the magnets arrive (my local source stop carrying the ones I was using) I will complete the yard area track. I will be moving on to installing the 15 tortoise switch machines next for all the work complete in the last few weeks.


Rich started the prep (during his visit) on my tortoise machines by soldering on a connector I like using. Thanks Rich. Next will be to create the new throw rod for my thick deck.

Thanks for following.