Since the last post I have spend little time on the Layout, but some progress has been made.
First, more wiring inside the first control panel
Second, wiring of the Diode-Matrix and Relay board
Third, Mount and started wiring of the CAT 5 Punch-Block blocks for Tortoise Switch Machine wiring termination
Sunday, October 23, 2011
Tuesday, October 4, 2011
Control Panel - Front Panel Progress Continue
Well it's been about a month since my last update. I have not spend much time on the layout, somewhere between a half to two hours a week, so progress has been slow. Here are some photo of were I am at today. (sorry for the lousy photos)
First - Diode-Matrix and Staging Track Power Relay board mounting back side of control panel.
Next two - Inside control panel
Next two - Front of Control Panel with power to staging selector switches.
Note above in the photo the screw heads and plug receptacle (lower right).
I am using low tech or old tech to control turnouts, using a wand to touch the screw heads to change the route of turnouts.
First - Diode-Matrix and Staging Track Power Relay board mounting back side of control panel.
Next two - Inside control panel
Next two - Front of Control Panel with power to staging selector switches.
Note above in the photo the screw heads and plug receptacle (lower right).
I am using low tech or old tech to control turnouts, using a wand to touch the screw heads to change the route of turnouts.