I have setup my unfinished Door Layout to work on and run trains while I develop a track plan and organize the new room. It's been in storage for 22 months. Click on the link above for more photos.
Here the track plan
Wednesday, December 29, 2010
Walls and Ceiling Finished
Completed Walls and Ceiling. Electrical Receptacles , Lighting and Ceiling Fans installed.
Will be a while before finishing the floor, but room is usable.
Think I will setup my 36x80 Door Layout for now to have a layout to work on and run trains again.
While I work on a new plan for this room.
Will be a while before finishing the floor, but room is usable.
Think I will setup my 36x80 Door Layout for now to have a layout to work on and run trains again.
While I work on a new plan for this room.
Saturday, December 4, 2010
Been a while since my last post, so here my progress.
Most of the room has been textured and painted
This area is what left to finish, then on to the floor, ceiling lights and fans.
Also note I have added an window air conditioner/heater unit. I now have comfort while working.
Most of the room has been textured and painted
This area is what left to finish, then on to the floor, ceiling lights and fans.
Also note I have added an window air conditioner/heater unit. I now have comfort while working.
Subscribe to:
Posts (Atom)